News and Events

More Space for Young People in SALEM-Raduga

18.09.2024

Construction work began on a new building on the premises of our project near Kaliningrad recently. The vacation home for our children and youth camps will offer space for at least 8 people.

A wise man once said: “Everything should be planned from the top down, except the foundation, which is where you should start.” And so the construction of the foundation was the first phase of the major building project. The construction workers laid the markings, set up the formwork and poured the concrete.

Not long ago, a large truck came to our village and brought gravel. The material will form a drainage system that will prevent irrigation and erosion of the soil under the hut.

In the meantime, the walls have also been erected and we hope that everything will proceed according to plan.

Our next plan is to build a new playground. There is a lot of enthusiasm for playgrounds, but unfortunately our playground equipment is old and no longer safe.

We urgently need help and require €1500 for the time being. We want to do a lot of the work ourselves, but the equipment is expensive, so we would be very happy if you would support our project with a donation. You can do this online here.


Report by SALEM-employee Alina

to top ▲